HomeCase studiesGrand Union Village replacement pedestrian and cycle footbridge.

Grand Union Village replacement pedestrian and cycle footbridge.

East London

VolkerBrooks has fabricated a 27m long, 2m wide Grand Union Village replacement pedestrian and cycle footbridge. 

Working with Beaver Bridges, the new bridge; which was installed on Sunday 12th July, replaces an existing bridge structure that spanned the Grand Union Canal in Ealing, East London. 

The bridge, constructed at our in house fabrication facility, was fabricated in one section to allow for a one day installation.   

VolkerBrooks has a long standing relationship with Beaver Bridges and worked closely with their project team to ensure all project drivers were met. 

Henry Beaver, managing director of Beaver Bridges said: “Having established a great working relationship with the VolkerBrooks team we were confident that this project would be delivered on time and to the same high standards we are used to and we were not wrong. This impressive structure was clearly fabricated with the skill and quality that is at the heart of VolkerBrooks.”

Facts and figures

  • Client
    Beaver Bridges
  • Duration
    Two months
  • value
    £25,000
  • Project categories
    Fabrication

Learn more about this project?

Contact info@volkerbrooks.co.uk »

Related News

More news

New bridge provides safer access for school children

VolkerBrooks has helped make the trip to Bridgnorth Endowed School in Shropshire safer after successfully constructing a new...

+