icon-arrow-right icon-play icon-close
HomeOur workPark Live! Olympic Park

Park Live! Olympic Park

London

Star Events were contracted to provide and install two large video screens, on gantries over water, with a corporate entertainment facility inside the structure between the screens however the only access to this work was via the waterway within the Olympic Park.

VolkerMarine Services supplied the marine equipment, including mobilisation and demobilisation, to enable Star Events to satisfactorily carry out the work from the nearest available road access.

The VolkerMarine Services marine equipment consisted of:

  • 1 x 6 Linkflote pontoon crane barge
  • 1 x 6 Linkflote pontoon materials barge
  • 1 x 24 Linkflote pontoon barge for erecting the gantries, screens etc.
  • 1 Schottle Boat to manoeuvre barges

Park Live

Park Live

Park Live

Park Live

Park Live

Park Live

Removal of the installation was after the Paralympics, using the same techniques and equipment.

Facts and figures

  • Client
    Star Events
  • Duration
    5 months

Learn more about this project?

Contact info@volkermarineservices.co.uk »
+

Get in touch

Feel free to contact us if you are looking for something specific or if you have any questions.

Contact us